Project 2002 Raptor 660

Swing arm appears to be in pretty good shape so it will be set aside till assembly.

Down to the bare frame ready for blasting.

Brian this one is for you. Yet another ice cream tub of bolts to clean.

The pile of puzzle parts waiting for re-assembly.

Sub frame welded in places that needed repair and glass bead cleaned.

Shock link pivot clearanced so it can be flipped to lower the rear end.

Cutting the valve seats on the Tobin Arp at work.

Finished head ready for new parts and assembly. 

Lower a-arms stripped and blasted.

Bottom side before and after blasting.

Nothing but great work comes out of this guys shop!!

Sitting on the slab at MTS ready for gloss black powder coat.

Previous Page, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11 Next Page

Home Page